Back to Browserbase in Google Sheets
SheetXAI logo
Browserbase logo
Browserbase · Google Sheets Guide

Audit Failed Browserbase Sessions Into a Google Sheet

2026-05-13
5 min read

The Scenario

Someone on your team mentions it offhand in standup: "The Browserbase sessions have been failing intermittently for the past week." No ticket, no details, just a comment. You own the automation infrastructure. Which sessions? What's failing? You pull up the Browserbase dashboard and see a list of sessions — statuses, timestamps, project IDs — but the logs are one click deep, per session.

There are 60 sessions from the past 7 days. Forty completed. Twenty didn't.

The bad version:

  • Filter the Browserbase dashboard to show ERROR status. Click session 1. Open the logs panel. Read the error. Note it down somewhere.
  • Click back. Click session 2. Open the logs. Note the error. Back. Repeat.
  • Fifteen sessions in, you've lost track of which errors are the same underlying issue and which are different. Your notes are in a doc that isn't a sheet, so sharing them with the team means more reformatting.

The sprint review is Tuesday. You need a structured view of what's been failing and why — today.

The Easy Way: One Prompt in SheetXAI

SheetXAI is an AI agent that lives inside your Google Sheet. Through its built-in Browserbase integration, it can query sessions by status, retrieve logs for each one, and write the results into a structured sheet — so you get the full failure picture without clicking through 20 dashboard pages.

Here's the prompt for this task:

List all Browserbase sessions with status ERROR from the past 7 days, and for each one fetch the session logs — write session ID, start time, project ID, and the first error message from the logs into columns A through D

What You Get

  • Column A: session ID
  • Column B: session start timestamp
  • Column C: project ID the session belongs to
  • Column D: the first error message from the session logs
  • One row per errored session. Nothing from completed sessions. No manual filtering.

What If the Data Is Not Quite Ready

I want both ERROR and COMPLETED sessions so I can compare

List all Browserbase sessions from the past 7 days regardless of status, and for each one write session ID, status, start time, duration, and project ID into columns A through E — sort by status so errors appear first

Some sessions have the same error message and I want them grouped

List all Browserbase sessions with status ERROR from the past 7 days, fetch their logs, write session ID and error message into columns A and B, then in column C add a label grouping sessions with the same error message — show unique error types in column E with a count

I need to cross-reference session failures against a project list already in the sheet

The "Projects" tab has project IDs in column A and project names in column B. List all Browserbase sessions with status ERROR from the past 7 days, look up the project name from the "Projects" tab, and write session ID, project name, start time, and error message into the "Failures" tab in columns A through D

I want to pull the failures, categorize the errors, and flag which project has the most failures

List all Browserbase sessions with status ERROR from the past 7 days, fetch logs and write session ID, project ID, start time, and error message into columns A through D, then add a summary in column F showing each unique project ID and its failure count — bold the row with the highest count

One prompt does the pull, the categorization, and the summary.

Try It

Open a blank Google Sheet and get the 7-day free trial of SheetXAI — ask it to pull your Browserbase errored sessions from the past week into a structured audit log. Then check out the URL session runner spoke or the full Browserbase hub for more.

Stop memorizing formulas.
Tell your spreadsheet what to do.

Join 4,000+ professionals saving hours every week with SheetXAI.

Learn more