Back to Hub Planner in Google Sheets
SheetXAI logo
Hub Planner logo
Hub Planner · Google Sheets Guide

Import Timesheet Rows From Google Sheets Into Hub Planner

May 13, 2026
4 min read
See the Excel version →

The Scenario

You are a finance manager at a mid-size agency. The billing cycle closes tomorrow at noon. You have a Google Sheet with 400 timesheet rows collected manually from contractors over the past month: resource email, project code, date, and hours.

Every one of those rows needs to be in Hub Planner as a time entry before the billing run. You have been collecting them all month. Today is the day they have to get in.

The bad version of this morning:

  • Filter the sheet to find the rows you have not entered yet
  • Open Hub Planner, navigate to the timesheet for resource one, project one
  • Find the right date, type the hours, save, move to the next entry
  • Lose your place on row 47 and have to cross-reference with the sheet again
  • Discover that three rows have project codes that do not exist in Hub Planner
  • It is 3 PM. You have 280 rows left. The billing run starts in the morning.

The fast version is one prompt.

The Easy Way: One Prompt in SheetXAI

SheetXAI is an AI agent inside your spreadsheet that reads every row and pushes it to Hub Planner as a time entry, flagging errors back to the sheet where you can fix them.

Open the SheetXAI sidebar and type:

For each row in my sheet, create a Hub Planner time entry using the resource email in column A to look up the resource ID, the project ID from column B, the date from column C, and the hours from column D converted to minutes. Write any error message to column F.

SheetXAI reads all 400 rows, resolves each email to a Hub Planner resource ID, converts hours to minutes, calls the time entry API for each row, and writes errors back to column F. You end up with a sheet where every successful row has nothing in column F and every failed row has an explanation.

What You Get

400 time entries pushed, with a legible error log back in the sheet:

  • Successful rows — time entry created, column F blank
  • Failed rows — error message in column F ("resource not found," "project code does not exist," "date out of range")
  • Zero manual navigation — you did not open Hub Planner once

The error column turns a batch job into a review task. You filter column F to non-blank, fix the underlying issues, and re-run just those rows. The billing run starts with complete data.

What If the Data Is Not Quite Ready

Manually collected contractor timesheets are never clean. SheetXAI handles the messiness and the import in the same prompt.

When hours are entered as decimals with inconsistent precision

Some rows say "7.5," some say "7.50," some say "7:30" in time format. Hub Planner expects whole minutes.

Normalize all values in column D to decimal hours, then convert to whole minutes (round to nearest minute). Create the Hub Planner time entry for each row using the converted minutes, and write any errors to column F.

When some project codes are missing

A handful of contractors left the project column blank because they were not sure which code to use.

For rows where column B is blank, skip the time entry and write "Missing project code — needs manual review" to column F. For all other rows, create the time entry normally.

When the date column has entries from the wrong month

The sheet accumulated rows from the previous billing cycle that were already submitted.

Filter to rows where the date in column C falls within the current billing period (first to last day of the current month). Create Hub Planner time entries only for those rows. For rows outside the period, write "Outside billing period — skipped" to column F.

When resource emails do not match Hub Planner records

Some contractors changed their email and Hub Planner still has the old one. You have a lookup tab mapping old emails to new ones.

Before creating time entries, check each email in column A against the Email Mapping tab. If there is a match in that tab, use the corrected email instead. Then create Hub Planner time entries for all rows using the corrected emails where applicable, and write errors to column F.

The pattern: instead of cleaning the sheet by hand before you import, you describe the issues in the prompt and SheetXAI handles them during the import. Four hundred rows, one prompt, one review pass.

Try It

Get the 7-day free trial of SheetXAI and open your timesheet collection sheet, then ask SheetXAI to push the rows to Hub Planner. The Hub Planner integration is included in every SheetXAI plan. For the other side of this workflow, see how to export approved time entries for invoicing or the Hub Planner in Google Sheets overview.

Stop memorizing formulas.
Tell your spreadsheet what to do.

Join 4,000+ professionals saving hours every week with SheetXAI.

Learn more