Back to Motion in Google Sheets
SheetXAI logo
Motion logo
Motion · Google Sheets Guide

Bulk Create Motion Tasks From a Google Sheet

2026-05-14
5 min read

The Scenario

It is 8:47 AM on the Monday a new sprint kicks off. You are the engineering team lead. The sprint board lives in a Google Sheet — 25 rows, columns A through D: task name, due date, priority, assignee email. You built it in planning on Friday. Now it needs to be in Motion before the 9:15 standup so the auto-scheduler can start moving things around.

The bad version:

  • Open Motion, click New Task, type the task name from row 1, select the due date, set the priority, enter the assignee email. Save. Repeat.
  • Hit row 8 and realize you have been entering dates in the wrong format — Motion wants MM/DD and you have been typing YYYY-MM-DD. Go back and fix them.
  • Finish row 25 at 9:12, realize you forgot to set three priorities, fix those, and walk into standup having touched nothing in your actual code today.

You have 28 minutes before standup and a full sprint's worth of work to set up. This is not the morning for a 25-step data entry session.

The Easy Way: One Prompt in SheetXAI

SheetXAI is an AI agent that lives inside your Google Sheet. It reads the sprint board you already built and talks to Motion directly. Open the sidebar, type your ask.

Create a Motion task for each row in the Sprint tab using the name in column A, due date in column B, priority in column C, and assignee email in column D — write the returned task ID to column E.

What You Get

  • All 25 Motion tasks created with the correct name, due date, priority, and assignee.
  • Motion task IDs written back to column E — one per row — so you can reference or update them later.
  • Any row that fails (invalid email, unrecognized priority value) surfaces an error note in column E instead of a silent skip.

What If the Data Is Not Quite Ready

The due dates are in the wrong format

Motion expects a specific date format and your sheet has dates stored as plain text in a mix of styles.

For each row in the Sprint tab, normalize the date in column B to ISO 8601 format (YYYY-MM-DD), then create a Motion task using the task name in column A, the normalized date, priority from column C, and assignee email from column D — write the task ID to column E.

Some rows are missing an assignee

Not every task has an owner yet — column D is blank on eight rows.

For rows in the Sprint tab where column D is blank, create the Motion task without an assignee using the name in column A, due date in column B, and priority in column C — write the returned task ID to column E and note "unassigned" in column F.

Tasks live across two tabs and need to be combined

Your backend tasks are in the Backend tab and frontend tasks are in Frontend — you want them all in Motion.

Create Motion tasks from both the Backend tab and the Frontend tab. For each row, use column A for the task name, column B for the due date, column C for the priority, and column D for the assignee email. Write the returned task ID to column E on the respective tab.

The sheet needs cleaning, deduplication, and creation in one pass

You just merged two planning spreadsheets and there are duplicate task names, inconsistent priorities, and blank due dates that need to default to end-of-sprint.

In the Sprint tab, remove any duplicate rows where column A matches exactly. For rows with a blank column B, set the due date to 2026-05-30. Normalize priority values in column C so that High/Med/Low map to ASAP/Medium/Low respectively. Then create a Motion task for each remaining row using column A, the cleaned column B, the normalized column C, and column D — write the task ID to column E.

Ask for the cleanup and the creation together. SheetXAI handles both in sequence without a separate prep step.

Try It

Open a sprint planning sheet with task names, due dates, priorities, and assignee emails, then Get the 7-day free trial of SheetXAI and ask it to push the whole board into Motion. For related tasks, see how to export completed Motion tasks for billing or batch-update task priorities from a sheet.

Stop memorizing formulas.
Tell your spreadsheet what to do.

Join 4,000+ professionals saving hours every week with SheetXAI.

Learn more