Back to OptimoRoute in Google Sheets
SheetXAI logo
OptimoRoute logo
OptimoRoute · Google Sheets Guide

Bulk Upload Delivery Orders Into OptimoRoute From a Google Sheet

2026-05-14
5 min read

The Scenario

You are a logistics coordinator at a food delivery company, and it is 4:15 PM on Thursday. Tomorrow's delivery batch — 300 orders, each with an order number, customer name, address, and time window — has been sitting in your Google Sheet since noon, compiled by the order management team. The route planning window closes at 6 PM. If the orders are not in OptimoRoute before then, the drivers go out tomorrow without optimized routes.

The bad version:

  • You open OptimoRoute's import screen and export your sheet as a CSV, then realize the address column includes apartment numbers in a format OptimoRoute rejects — so you spend 20 minutes cleaning the column before re-exporting.
  • You upload the cleaned CSV, hit submit on 300 orders, and watch the import report come back with 14 failures — addresses that parsed incorrectly — which you now have to find and fix in the sheet, then re-upload just those rows.
  • It is 5:50 PM when the last batch goes through. You do not have time to verify that all 300 landed correctly before the planning window closes.

The point is not that it failed — it is that 90 minutes of your afternoon went into a data transfer that should have taken five. That time was supposed to go toward reviewing the route plan itself.

The Easy Way: One Prompt in SheetXAI

SheetXAI is an AI agent that lives inside your Google Sheet. It reads the data directly and uses its built-in OptimoRoute integration to create orders in bulk — no CSV, no import screen, no format negotiation.

Open the SheetXAI sidebar and ask:

For each row in columns A through E — order number, customer name, address, time window start, time window end — bulk-create OptimoRoute orders for all rows and write success or failure status into column F.

What You Get

  • Every row in your sheet gets submitted to OptimoRoute in a single batch operation.
  • Column F is written with either "created" or the specific error message for each row — so you can see at a glance which addresses failed.
  • Rows with blank order numbers in column A are automatically skipped.
  • The full batch runs in under a minute for 300 rows, leaving time to review the results before the planning window closes.

What If the Data Is Not Quite Ready

The addresses include apartment numbers in a format OptimoRoute rejects

For each row in the 'Tomorrow Orders' sheet, combine the street address in column B with the unit in column C into a single formatted address before creating the OptimoRoute order — write the combined address into column G and the order status into column H.

Some rows are missing a time window start

Upload all rows from the 'Orders' sheet where column D is not blank — use order number from column A, address from column B, time window start from column D, and time window end from column E — write created or failed into column F and skip any row missing a time window.

Orders are split across two tabs for morning and afternoon windows

From both the 'AM Orders' and 'PM Orders' tabs, combine all rows and bulk-create OptimoRoute orders — use order number from column A and address from column B in each tab — write the result status back into column F of the respective tab.

The addresses need cleaning, the time windows need normalization, and then the orders need uploading

For each row in the 'Raw Orders' sheet, trim any extra spaces from the address in column B, convert the time window start and end in columns D and E from 12-hour to 24-hour format, then create the OptimoRoute order — write the cleaned address into column G and the upload status into column H, and flag any row where the address looks incomplete.

When the data is not ready, ask for the cleanup and the upload in the same prompt. SheetXAI handles both steps without needing a separate cleaning pass first.

Try It

Get the 7-day free trial of SheetXAI and open the sheet where your tomorrow's order batch lives, then ask it to upload every row to OptimoRoute and write the result back in. If you handle multi-day planning, also see how to export completed route data and how to trigger route optimization after upload.

Stop memorizing formulas.
Tell your spreadsheet what to do.

Join 4,000+ professionals saving hours every week with SheetXAI.

Learn more