Back to Leiga in Google Sheets
SheetXAI logo
Leiga logo
Leiga · Google Sheets Guide

Pull All Leiga Projects Into a Google Sheet for a Portfolio Status Overview

2026-05-14
5 min read

The Scenario

You're the operations director. Twelve active Leiga projects, three different departments, and a steering committee meeting on Friday. Your job right now is to produce a single-sheet portfolio view — project name, owner, current status, creation date — so the committee can assess progress without you clicking through each project in real time on a conference room screen.

You know what the bad version looks like:

The bad version:

  • Open Leiga, navigate to the Projects list, and start clicking into each project to read off the owner and status fields.
  • Build out your sheet row by row, manually transcribing twelve sets of field values while checking that your formatting matches across columns.
  • Realize midway through that three projects changed status since you started, so you go back and re-check them.

Running a twelve-project portfolio review is not the same as doing data entry. One of those things is your job; the other one just consumed it.

The Easy Way: One Prompt in SheetXAI

SheetXAI is an AI agent that runs inside your Google Sheet. It reads your sheet, connects to Leiga through its built-in integration, and writes the results directly into your columns. You don't configure endpoints or map fields by hand.

List all Leiga projects and write the project name, owner, status, and creation date into columns A–D of this sheet

What You Get

  • Column A: project name for every Leiga project, one row each
  • Column B: the project owner's name
  • Column C: current status (Active, On Hold, Completed, etc.)
  • Column D: creation date in a consistent format
  • Rows populate in the order Leiga returns projects; SheetXAI surfaces any projects it couldn't retrieve with a note in the relevant row

What If the Data Is Not Quite Ready

The project list is longer than expected and you only want active ones

List all Leiga projects with a status of 'Active' and write the project name, owner, and creation date into columns A–C of the 'Active Projects' tab

You want to add a last-updated column but it isn't in the current output

Fetch all Leiga projects and write project name, owner, status, creation date, and last-modified date into columns A–E — use 'N/A' if last-modified is unavailable

The portfolio sheet already has a header row and some pre-existing data

Append the Leiga project list below the existing content in this sheet, starting at the first empty row — write project name, owner, status, and creation date into columns A through D

Clean the data and build the portfolio view in one shot

Fetch all Leiga projects, filter to only those with status 'Active' or 'In Progress', sort by creation date oldest-to-newest, and write name, owner, status, and creation date into columns A–D of the 'Portfolio' tab — clear the tab first

The pattern: ask for the filter, the sort, and the write-back together. SheetXAI handles the conditional logic inline rather than requiring a separate prep step.

Try It

Get the 7-day free trial of SheetXAI and open the Google Sheet where you track your Leiga project portfolio, then ask it to pull the full project list into columns A–D. When you're done, check out how to fetch detailed project metadata for reporting or the full Leiga integration overview.

Stop memorizing formulas.
Tell your spreadsheet what to do.

Join 4,000+ professionals saving hours every week with SheetXAI.

Learn more