Back to TimeCamp in Google Sheets
SheetXAI logo
TimeCamp logo
TimeCamp · Google Sheets Guide

Look Up TimeCamp Task IDs From Project Names in a Google Sheet

2026-05-14
5 min read

The Scenario

You coordinate a 12-person team across four clients, and your master tracker in Google Sheets is the source of truth for everything downstream — payroll, billing, cost center allocation. Every row represents a project. Column A has the project name. Column B is supposed to have the TimeCamp task_id so payroll can match hours to the right cost center.

Column B is mostly empty.

The person who set up the master tracker left the company six weeks ago. You've been manually looking up task_ids in TimeCamp one project at a time — opening the project, copying the ID, pasting it back into the sheet. You've done it for eight projects. There are 23 more to go.

The bad version:

  • Open TimeCamp, search for each project name in the list, click through to the project detail, find the task_id field, copy it
  • Switch back to Sheets, find the right row, paste the value into column B
  • Move to the next project and repeat — 23 more times, with no guarantee your search results are returning the right match when two client projects have similar names

This is the kind of work that makes you feel like you're doing data entry for a living. You're not. You coordinate a team. This is not what coordination looks like.

The Easy Way: One Prompt in SheetXAI

SheetXAI is an AI agent that lives inside your Google Sheet. It reads your existing data, looks up each project name against TimeCamp's API, and writes the matching task_id directly into the column you specify — no tab-switching, no search, no paste.

Look up each project name in column A against TimeCamp and write the matching task_id into column B — leave column B blank if no match is found

What You Get

  • Each row in column A is matched against TimeCamp's project list by name
  • The corresponding task_id is written into column B for every row that has a match
  • Rows where the project name doesn't match anything in TimeCamp are left blank, not overwritten with a guess
  • You can see immediately which names need to be corrected before payroll runs

What If the Data Is Not Quite Ready

Project names in the sheet don't exactly match what's in TimeCamp

Look up each name in column A against TimeCamp projects, write the task_id into column B if there's an exact match, and write "No match — check spelling" if the name doesn't resolve

You only want to fill in task_ids for active projects

For every row in this sheet where column C says "active", look up the project name in column A against TimeCamp and write the matching task_id into column B

You need to add budget and user count alongside the task_id

Look up each project name in column A against TimeCamp, write the task_id into column B, the project budget into column C, and the number of assigned users into column D

Full enrichment-and-flag pass before payroll runs

Look up every project in column A against TimeCamp, write task_id into column B, budget into column C, and assigned users into column D — then add a column E that says "Ready" if task_id is populated and "Fix" if it isn't, and sort the sheet so all "Fix" rows are at the top

Everything you need before the payroll handoff — in one prompt.

Try It

Get the 7-day free trial of SheetXAI and open your project master tracker, then ask it to fill in the TimeCamp task_ids for every project name in column A. It reads your sheet, looks up each one, and writes back the values your payroll team is waiting for.

Also useful: Pull Your Full TimeCamp Project List Into a Sheet and the TimeCamp + Google Sheets overview.

Stop memorizing formulas.
Tell your spreadsheet what to do.

Join 4,000+ professionals saving hours every week with SheetXAI.

Learn more